Find Parallel Clamp Cable, Parallel Clamp Assembly, Parallel Clamp Blocks on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Home > Products > ABC Cable Fitting > Parallel Clamp > JBTL Bimetallic PG Clamp

JBTL Bimetallic PG Clamp

Packaging: 
Carton, Wooden case, Sack
Transportation: 
Ocean,Land
Place of Origin: 
Fuzhou, China
HS Code: 
76169990
Port: 
FUZHOU

Basic Info

Model No.: JBTL

Product Description

JBTL Bimetallic PG Clamp

Bimetallic parallel clamps are mainly used for current transfer between interconnected conductors , parallel clamp cable. In addition to current transfer, parallel clamps are also used for safety loops, so parallel clamp assembly must have a sufficient mechanical grip.

Bimetallic aluminum - copper PG clamp can be used to connect conductors made of different materials. In the bimetallic PG parallel clamp blocks, the two main bodies are made of high-strength aluminum alloy, and the grooves are made of aluminum alloy and welded with hot-forged bimetallic plates to tighten the copper conductor. The bolts are made of hard steel and dacromatized.

Bimetal copper aluminium Parallel Groove Clamp /Parallel-Gro

Type Cross Section (mm²) Dimensions(mm)
Main Branch B L M(Bolt)
JBTL-AL 16-70/Cu 6-50 AL 16-70 Cu 6-50 26 26 M8(1pcs)
JBTL-AL 25-150/Cu 10-95 AL 25-150 Cu 10-95 32 50 M8(2pcs)
JBTL-AL 35-120/Cu 6-35 AL 35-120 Cu 6-35 40 42 M8(2pcs)
JBTL-AL 35-300/Cu 35-240 AL 35-300 Cu 35-240 65 104 M10(3pcs)
JBTL-AL 35-200/Cu 16-185 AL 35-200 Cu 16-185 57 63 M10(2pcs)
JBTL bimetallic clamp

Type Cross Section (mm²) Dimensions(mm) Weight(kg)
L B M
JBTL-10-95 10-95 40 40 41 0.235
JBTL-16-120 16-120 47 55 48 0.273
JBTL-50-240 50-240 45 60 62 0.391
JBTL-10-95 10-95 40 40 38 0.235
JBTL-16-240 16-240 45 55 48 0.273
JBTL-50-240 50-240 45 60 62 0.391
bimetallic PG clamp

Our Services

1. Small Orders Accepted
2. Fast producing time, Prompt Delivery
3. International Approvals
4. Reply promptly in 24 hours
5. Best Price

FAQ:

1. Q: How about payment terms?
A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment can be negotiated.
2. Q: Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
3. Q: Are you a Manufacture Factory?
A: Yes. We are the direct manufacture factory, and our factory has specialized in porcelain insulator,composite insulator,glass insulator,arrester, Cold And Heat Shrinkable Tube,cut out fuse and power fitting ,etc.

4. Q: How long is producing time ?

A: Normally it will take about 30 days for production.

5. Q: What is the standard of package ?
A: For small capacity, we use carton, but for big capacity, we will use strong wooden case for protection or double inner packs in a master carton.
6. Q: How do you make sure your good quality ?

A: We use the best raw material , and every single product will go through a series of strict test.

insulator

insulation

We warmly welcome friends both domestic and abroad to visit our company, if you have any questions, please contact with us directly.

Contact us if you need more details on Parallel Clamp Cable. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Parallel Clamp Assembly、Parallel Clamp Blocks. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : ABC Cable Fitting > Parallel Clamp